Niagara, New York · Capacity

Power is live. The queue is somebody else's problem.

Ten megawatts energized today on hydropower, fifty by the end of 2026, and two hundred megawatts interconnected on an approved load ramp through 2027. No interconnection queue. No five-year wait.

Request the site briefWalk the site

Availability

What Is Energized, and What Comes Next

TrancheStatusTiming
First 10 MWEnergizedLive now
To 50 MWPower availableEnd of 2026
To 200 MWInterconnected, approved load rampThrough 2027

Capacity is currently being contracted against the first 50 MW. The balance of the interconnected ramp is not yet offered.

The Site

Built on Ground That Already Carried Heavy Load

Niagara Falls has served industrial load on hydropower for over a century. The position is three sites — a brownfield redevelopment on a former steel plant, currently in demolition. Ground with heavy continuous electrical service already established, rather than greenfield acreage waiting on a utility study.

The sites carry rail and natural gas on parcel. Footprints are dense and compact, which shapes the build: modular deployment first, then a multi-story data hall rather than a single-storey campus.

Power

Hydro, Behind the Constraint

Power is drawn from the Niagara hydroelectric system — the largest generating asset in New York State, and the reason heavy industry sited here in the first place. Supply is delivered on an approved load ramp rather than through an interconnection queue, which is what separates this position from sites where power is a forecast.

Pricing sits well below regional grid supply and is set out in the site brief.

Resilience.
Natural gas backup is already live on site, which removes the fuel-delivery logistics that diesel generation imposes. Short-duration bridging uses sodium-based storage rather than lithium — a deliberate choice given how sustained AI load profiles degrade lithium chemistry.
Expansion.
On-site gas supports a path beyond the interconnected ramp. Configuration is being finalized and is not currently offered.

Cooling and Water

Climate and River Do the Work

A January average near 25°F supports extensive free cooling across much of the year, cutting mechanical load and the PUE penalty it carries. The Niagara River provides process water at a scale no inland site can match, under established permitting for industrial withdrawal.

Together they change the operating cost profile in the direction power pricing already points.

Connectivity

Two Carrier Hotels, Two Countries

Multiple network access points serve the immediate area, with carrier hotels in Buffalo and Toronto. Cross-border routing gives diverse paths and puts Canadian AI workloads inside a short fibre run — a position no other site in the portfolio holds.

Terms

How Capacity Is Contracted

ISS Mining carries the capital and operates the site. Capacity is leased directly; there is no requirement to acquire land or fund construction.

Minimum commitment — 1 MW.
Whole units only; the modular design does not support partial build-outs.
Modular term — five years.
Capacity delivered in modular form ahead of the data hall, on the same power and cooling architecture.
Migration to the data hall.
Modular tenants can move into the permanent building on completion. Data hall terms run shorter than modular terms.
Anchor position.
One investment-grade anchor commitment of 20–30 MW is being sought. Remaining capacity carries no investment-grade requirement, and the site will not be committed to a single operator.

Request the site brief

Operations

Run by the People Who Built It

ISS Mining operates the site directly rather than contracting operations out. The engineering and operations team is qualified on combined heat and power plants at several hundred megawatts — generation operating experience, not facilities management with a generation vendor attached.

The permanent data hall is a multi-story build on a fourteen-month schedule, with commercial operation targeted for mid-2028.

Regulatory

Grandfathered

The City of Niagara Falls has a moratorium in place on new commercial data centers while zoning is rewritten. This position is grandfathered — the permit was submitted ahead of it, and the power study falls within the moratorium's own guidelines.

Delivery of the later tranches sits beyond the moratorium window, and the site is positioned to meet the requirements that follow it. Local support is strong: the area is actively seeking industrial tax base, and relationships run to the state level on air permitting.

Close

Come and See It Energized

The brief covers pricing, the full ramp with the conditions behind each tranche, the technical specification, and the terms. The site itself is the better version — the power is on and the construction is visible.

Request the site briefWalk the site

Request the site brief