01 / Site Portfolio

Our Infrastructure Footprint.

Entitled land, secured power, and permit-ready sites — purpose-built for next-generation AI data center operations.

Available for Development
02 / Available for Development

Permit-ready parcels.

Entitled land with secured power — available for direct development or joint venture with operators at scale.

Available for DevelopmentBig Wells, TX

Dimmit

A 2,500-acre AI infrastructure campus in Dimmit County, Texas, engineered for high-density compute with on-site natural gas generation and direct ERCOT grid access.

2,500
Acres
816 MW
Capacity
ERCOT
Grid
PhasePhase 1 — Entitlement
TransmissionGrid Independent
ZoningNo municipal zoning
WaterCarrizo-Wilcox Aquifer
Gas3 pipelines on-site · Permian Basin & Eagle Ford Basin supply
FiberDual-path: San Antonio & Laredo
Available for DevelopmentLa Salle County, TX

LaSalle

A 12,092-acre site in the heart of the Eagle Ford Shale, sized for multi-gigawatt buildout with three independent aquifer systems and direct access to 4.5 Bcf/d of pipeline gas.

12,092
Acres
Multi-GW
Capacity Path
ERCOT
Grid
PhaseMaster Planning
Transmission345 kV existing; 765 kV planned
ZoningNo municipal zoning
Water3 independent aquifer systems
Gas4.5 Bcf/d on-site (Whistler + Blackcomb)
FiberTri-path: San Antonio, Laredo, Corpus Christi
Available for DevelopmentDalton, GA

Dalton

318-acre parcel with water and sewer service, 230 kV + 138 kV transmission on site, and rezoning approved in principle for industrial / data center use.

318
Acres
TBD
Capacity
North Georgia EMC / TVA
Grid
PhasePre-Entitlement — Rezoning Approved
Transmission230 kV + 138 kV on-site
ZoningIndustrial / DC by-right (approved in principle)
WaterMunicipal water & sewer available to site
Gas3.67 mi via transmission easement
FiberNearby along S Dixie Hwy corridor
Available for DevelopmentHarrison County, TX

Waskom

A 1,185-acre East Texas data center site with transmission-level grid access and on-site natural gas infrastructure, positioned in SWEPCO/SPP territory just south of Interstate 20.

1,185
Acres
TBD
Capacity
SPP
Grid
PhaseSite Viability
Transmission345 kV SWEPCO line through SW corner of site
ZoningNo restrictions outside city limits
WaterTBD — pending feasibility
Gas2 CenterPoint Energy lines on property
FiberI-20 long-haul corridor; Shreveport metro 15 mi
Available for DevelopmentTreutlen County, GA

Soperton

A 1,605-acre Southeast Georgia data center site with an aggressive 780 MW power drop schedule routed through Altamaha EMC and Georgia Transmission Corporation — no Georgia Power involvement.

1,605
Acres
780 MW
Capacity Path
Altamaha EMC / GTC
Grid
PhaseSite Viability — County Support Secured
TransmissionAltamaha EMC distribution / GTC transmission
ZoningNo local zoning — county support letter in hand
Water3,000,000 gallons/day available
GasBehind-the-meter solar optionality
FiberDark backbone fiber near property
Available for DevelopmentHaywood County, TN

Stanton

A 1,400-acre hyperscale-ready Tennessee data center site (1,300 buildable, no wetlands) adjacent to Ford's $5.6B BlueOval City campus, anchored by the newly commissioned TVA Stanton 500-kV substation — one of the largest in the TVA system.

1,400
Acres
100 MW Now / TVA Path
Capacity Path
TVA
Grid
PhaseSite Viability
TransmissionTVA Stanton 500-kV substation adjacent
ZoningAgricultural — rezoning in 30–90 days
Water2–3M gallons/day (Memphis Sand Aquifer)
Gas100 MW available today
FiberMemphis fiber corridor ~50 mi west
Available for DevelopmentCook County, GA

Cook County East

A 158-acre industrially zoned site in Cook County, Georgia with an existing 105,000 sq ft structure on-site, providing a substantial development foundation. Defined ramp-up schedule to 200 MW.

158
Acres
200 MW
Capacity Path
230 / 138 kV
Grid
PhaseIndustrial Zoning Active — Pre-PPA
Transmission230 kV or 138 kV stepped to 13.8 / 34.5 kV distribution; dual independent utility substations planned
ZoningHigh Power · Data Center / Industrial
Water300,000–600,000 gal/day · dual municipal feeds
GasDual gas mains from independent utility paths · on-site pressure regulation
Fiber6–10 diverse long-haul providers · terabits-per-second scale
Available for DevelopmentCook County, GA

Cook County West

A 40-acre site in Cook County, Georgia with 15–17 MW of active load on industrially zoned land, enabling immediate deployment with a defined ramp to 100 MW.

40.34
Acres
15–17 MW Now
100 MW Path
230 / 138 kV
Grid
PhaseActive Load — Expansion Ready
Transmission230 kV or 138 kV stepped to 13.8 / 34.5 kV distribution; dual independent utility substations planned
ZoningHigh Power · Data Center / Industrial
Water150,000–300,000 gal/day · dual municipal feeds
GasDual gas mains from independent utility paths · on-site pressure regulation
Fiber6–10 diverse long-haul providers · terabits-per-second scale
Available for DevelopmentNiagara Falls, NY

Niagara Falls 1

A 26-acre site in Niagara Falls' I2 High Energy Usage zone with a private 100 MW substation ready to energize. 10 MW available immediately; up to 200 MW within 12–18 months. Existing warehouse structures to be demolished. Part of a three-site Niagara Falls portfolio.

26.1
Acres
10 MW Now
200 MW Path
115 kV
Grid
PhaseSubstation Ready — Lease Pending
Transmission115 kV on-site · private 100 MW substation
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present
Available for DevelopmentNiagara Falls, NY

Niagara Falls 2

A 25-acre brownfield site in Niagara Falls' I2 High Energy Usage zone, 0.6 miles from Niagara Falls 1. Private 20 MW substation with 10 MW already energized; up to 200 MW within 12–18 months. Part of a three-site Niagara Falls portfolio.

25.3
Acres
10 MW Energized
200 MW Path
115 kV
Grid
PhasePartial Energization — Lease Pending
Transmission115 kV on-site · 20 MW substation (10 MW energized)
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present
Available for DevelopmentNiagara Falls, NY

Niagara Falls 3

A 22-acre powered-land site in Niagara Falls' I2 High Energy Usage zone, 4.3 miles from Niagara Falls 1. Private 100 MW substation in place with transformers pending replacement. 10 MW available immediately; up to 200 MW within 12–18 months. Part of a three-site Niagara Falls portfolio.

22.5
Acres
10 MW Now
200 MW Path
230 kV
Grid
PhasePowered Land — Lease Pending
Transmission230 kV on-site · private 100 MW substation (transformers to install)
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present