01 / Site Portfolio

Our Infrastructure Footprint.

Entitled land, secured power, and permit-ready sites — purpose-built for next-generation AI data center operations.

Available for Development
02 / Available for Development

Permit-ready parcels.

Entitled land with secured power — available for direct development or joint venture with operators at scale.

Available for DevelopmentBig Wells, TX

Dimmit

A 2,500-acre AI infrastructure campus in Dimmit County, Texas, engineered for high-density compute with on-site natural gas generation and direct ERCOT grid access.

2,500
Acres
816 MW
Capacity
ERCOT
Grid
PhasePhase 1 — Entitlement
TransmissionGrid Independent
ZoningNo municipal zoning
WaterCarrizo-Wilcox Aquifer
Gas3 pipelines on-site · Permian Basin & Eagle Ford Basin supply
FiberDual-path: San Antonio & Laredo
Available for DevelopmentLa Salle County, TX

LaSalle North

A ~2,583-acre quadrant of a contiguous 10,198-acre Eagle Ford Shale position — the closest quadrant to the existing Fowlerton–Lobo 345-kV line, the nearest existing high-voltage interconnection in the assembly.

2,583
Acres
GW-Scale
Capacity Path
ERCOT
Grid
PhaseMaster Planning
TransmissionClosest to Fowlerton–Lobo 345 kV; 765 kV planned
ZoningNo municipal zoning
Water3 redundant aquifer systems · Carrizo-Wilcox primary
Gas4.5 Bcf/d confirmed (Whistler + Blackcomb)
FiberDual-path: San Antonio & Laredo · optional Corpus Christi
Available for DevelopmentLa Salle County, TX

LaSalle East

A ~2,512-acre quadrant of a contiguous 10,198-acre Eagle Ford Shale position — the anchor development quadrant, with confirmed Carrizo-Wilcox subcrop and road frontage, positioned for phased build-out.

2,512
Acres
GW-Scale
Capacity Path
ERCOT
Grid
PhaseMaster Planning — Anchor Quadrant
Transmission345 kV existing (Fowlerton–Lobo); 765 kV planned
ZoningNo municipal zoning
WaterConfirmed Carrizo-Wilcox subcrop · 3 redundant aquifer systems
Gas4.5 Bcf/d confirmed (Whistler + Blackcomb)
FiberDual-path: San Antonio & Laredo · optional Corpus Christi
Available for DevelopmentLa Salle County, TX

LaSalle South (El Quinto)

A ~2,549-acre quadrant of a contiguous 10,198-acre Eagle Ford Shale position — the best-documented quadrant, with a private turboprop-capable airstrip on-site (FAA identifier 7TE8).

2,549
Acres
GW-Scale
Capacity Path
ERCOT
Grid
PhaseMaster Planning
Transmission345 kV existing (Fowlerton–Lobo); 765 kV planned
ZoningNo municipal zoning
Water3 redundant aquifer systems · Carrizo-Wilcox primary
Gas4.5 Bcf/d confirmed (Whistler + Blackcomb)
FiberDual-path: San Antonio & Laredo · optional Corpus Christi
Available for DevelopmentLa Salle County, TX

LaSalle West

A ~2,554-acre quadrant of a contiguous 10,198-acre Eagle Ford Shale position — nearest the Whistler mainline right-of-way, advantaged for gas-tap siting, with the shortest fiber path to Laredo.

2,554
Acres
GW-Scale
Capacity Path
ERCOT
Grid
PhaseMaster Planning
Transmission345 kV existing (Fowlerton–Lobo); 765 kV planned
ZoningNo municipal zoning
Water3 redundant aquifer systems · Carrizo-Wilcox primary
GasNearest Whistler mainline ROW · 4.5 Bcf/d confirmed
FiberShortest path to Laredo · dual-path with San Antonio
Available for DevelopmentDalton, GA

Dalton

318-acre parcel with water and sewer service, 230 kV + 138 kV transmission on site, and rezoning approved in principle for industrial / data center use.

318
Acres
TBD
Capacity
North Georgia EMC / TVA
Grid
PhasePre-Entitlement — Rezoning Approved
Transmission230 kV + 138 kV on-site
ZoningIndustrial / DC by-right (approved in principle)
WaterMunicipal water & sewer available to site
Gas3.67 mi via transmission easement
FiberNearby along S Dixie Hwy corridor
Available for DevelopmentHarrison County, TX

Waskom

A 1,185-acre East Texas data center site with transmission-level grid access and on-site natural gas infrastructure, positioned in SWEPCO/SPP territory just south of Interstate 20.

1,185
Acres
TBD
Capacity
SPP
Grid
PhaseSite Viability
Transmission345 kV SWEPCO line through SW corner of site
ZoningNo restrictions outside city limits
WaterTBD — pending feasibility
Gas2 CenterPoint Energy lines on property
FiberI-20 long-haul corridor; Shreveport metro 15 mi
Available for DevelopmentHaywood County, TN

Stanton

A 1,400-acre hyperscale-ready Tennessee data center site (1,300 buildable, no wetlands) adjacent to Ford's $5.6B BlueOval City campus, anchored by the newly commissioned TVA Stanton 500-kV substation — one of the largest in the TVA system.

1,400
Acres
100 MW Now / TVA Path
Capacity Path
TVA
Grid
PhaseSite Viability
TransmissionTVA Stanton 500-kV substation adjacent
ZoningAgricultural — rezoning in 30–90 days
Water2–3M gallons/day (Memphis Sand Aquifer)
Gas100 MW available today
FiberMemphis fiber corridor ~50 mi west
Available for DevelopmentHarrison County, MS

Biloxi

A ~900-acre Gulf Coast site in unincorporated Harrison County, Mississippi with a rare dual-substation configuration — a Mississippi Power substation on the property and a Coast Electric substation roughly 400 feet behind it — giving two independent interconnection paths for a 300 MW+ campus.

900
Acres
300 MW Target
500 MW Path
SERC
Grid
PhaseUnder Option — SIS Pending
TransmissionDual substations · Mississippi Power on-site · Coast Electric ~400 ft
ZoningUnincorporated Harrison County — no restrictive zoning
WaterConfirmed available at site
FiberAT&T, C Spire, Uniti CLEC, Southern Telecom · 100G–400G target
Available for DevelopmentNiagara Falls, NY

Niagara Falls 1

A 26-acre site in Niagara Falls' I2 High Energy Usage zone with a private 100 MW substation ready to energize. 10 MW available immediately; up to 200 MW within 12–18 months. Existing warehouse structures to be demolished. Part of a three-site Niagara Falls portfolio.

26.1
Acres
10 MW Now
200 MW Path
115 kV
Grid
PhaseSubstation Ready — Lease Pending
Transmission115 kV on-site · private 100 MW substation
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present
Available for DevelopmentNiagara Falls, NY

Niagara Falls 2

A 25-acre brownfield site in Niagara Falls' I2 High Energy Usage zone, 0.6 miles from Niagara Falls 1. Private 20 MW substation with 10 MW already energized; up to 200 MW within 12–18 months. Part of a three-site Niagara Falls portfolio.

25.3
Acres
10 MW Energized
200 MW Path
115 kV
Grid
PhasePartial Energization — Lease Pending
Transmission115 kV on-site · 20 MW substation (10 MW energized)
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present
Available for DevelopmentNiagara Falls, NY

Niagara Falls 3

A 22-acre powered-land site in Niagara Falls' I2 High Energy Usage zone, 4.3 miles from Niagara Falls 1. Private 100 MW substation in place with transformers pending replacement. 10 MW available immediately; up to 200 MW within 12–18 months. Part of a three-site Niagara Falls portfolio.

22.5
Acres
10 MW Now
200 MW Path
230 kV
Grid
PhasePowered Land — Lease Pending
Transmission230 kV on-site · private 100 MW substation (transformers to install)
ZoningI2 High Energy Usage · data center permitted
Water1.2+ MGD · domestic and industrial municipal supply
GasNatural gas available (National Fuel)
FiberSpectrum, Verizon, Crown Castle on property · dark fiber present